Image from Google Jackets

Methodology of evaluation studies for irrigation and CAD projects

By: Material type: TextTextPublication details: New Delhi Central Board of Irrigation and Power 1989Description: x, 181pSubject(s): DDC classification:
  • 333.913 I38M
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Copyright © 2020 GBPUAT. All Rights Reserved.